Dear customers, sales partners, suppliers and employees,
In a time full of challenges and change, one central question is closer than ever: What can I personally do to contribute to the success of the company? The answer doesn't start at the boardroom or with the next big trend - it starts with ourselves. Whether in sales, customer service, development or the back office: every contact, every idea, every decision has an economic impact. Turnover is not only generated through sales, but also through attitude, commitment and the pursuit of added value - for our customers and for our company.
Let us pause and consciously reflect: Where can I improve processes, inspire customers, provide new impetus? The key often lies in the small things - in active listening, in a suggestion that makes the difference. Success is a team effort. And it starts with the thinking of each individual.
With this in mind,
Yours, Erich Sennebogen
As an experienced provider in of waste disposal, container services, and raw materials trading, Rüschen GmbH & Co. KG has been serving customers in the region and beyond for around 35 years. More than 30 employees at the Lathen site ensure that waste management runs smoothly, from document destruction and grease trap disposal to scrap logistics.
In November 2023, the SENNEBOGEN 895 E was delivered to the Gateway Terminal in Connecticut, USA. The SENNEBOGEN 895 E will handle the loading of scrap as well as HMS (Heavy Melting Steel) and PNS (Plate and Structural Steel) into cargo ships for the metal recycling company Sims Metal.
Padana Rottami Srl, is known for the processing of iron and steel scrap. In September 2023, a SENNEBOGEN 840 E electric machine with pylon was successfully put into operation. This machine plays a central role in feeding the new sliding shear, which was developed for the volumetric reduction of metals.
The SENNEBOGEN 5500 E crawler crane has demonstrated its versatility and performance at the port of Straubing-Sand. The 180-ton crawler crane played a key role in the challenging loading of SENNEBOGEN material handlers onto a barge.
The SENNEBOGEN 6300E from Gwan-Ak is mounted on a ship in the Yellow Sea. The impressive offshore duty cycle crawler crane is designed to lift and maneuver heavy loads with precision, enabling fast assembly operations and maintaining high productivity on the construction site.
The collaboration between Hündgen Entsorgung and SENNEBOGEN began a few years ago with a trial rund of the 355 E. The successful testing of the 355 E was followed by a 340 G with an identical configuration - also on a hire purchase basis - and currently a 360 G in test operation at the Swisttal site.
Since the beginning of the year, the fleet of the Rotenburg waste collection association in Bebra has been strengthened by two new top performers. The company has invested in a new 340 G telescopic handler and a new 822 G material handler from SENNEBOGEN to ensure maximum handling efficiency.
Please send press inquiries to: [email protected]
SENNEBOGEN
Maschinenfabrik GmbH
Sennebogenstraße 10
94315 Straubing