A crawler crane does not meet the requirements that can only be fulfilled by a HD duty cycle crane in special civil engineering. The duty cycle crawler crane is top of its class in robustness, dynamism and performance.
Special civil engineering challenges
01 Excavation support
Creation of diaphragm walls to support excavations or deep foundations for underpinning with diaphragm wall widths of up to 1.50 m
02 Well construction / gaining resources
Grab drills and casing machines up to DN 3300
03 Leader applications
Fixed leader
Mounted leader
Swing leader
04 Compaction work
Dynamic soil compaction
Shaking plug compaction
Shaking pressure compaction
Special civil engineering / Hydraulic engineering pictures
01/07
660 Crawler - Soil compaction
02/07
690 HR Crawler - Pipework
03/07
630 Crawler - Pipework
04/07
655 Crawler - Hydraulic engineering
05/07
673 Crawler - Hydraulic engineering
06/07
690 HR Crawler - Diaphragm wall grab applications
07/07
6130 Crawler - Dredging
Special civil engineering / Hydraulic engineering videos